Killtest题库

专业IT认证题库学习资料,助您通过IT认证考试!

« killtest题库网提供CCNA最新的题库下载!最新的SY0-201题库免费下载! »

killtest题库网提供最新的000-104题库下载!

IBM认证考试之 000-104考试题库由我们专业IT认证讲师及产品专家精心打造,包括了当前最新的全真试题,全部附有正确答案。

IBM认证厂商对考试做出变动后,网站都将在第一时间公布题库的更新情况。确保题库覆盖率始终在96%以上,最终能够使考生一次通过考试,同时killtest题库网承诺“一次不过,全额退款”保证了考生的利益不受到任何的损失!

考题分享如下:

1. Which port must be open on the HMC to allow remote web access?
A.22
B.80
C.443
D.8080
Answer: C
2. Which are the two main uses of a VIO server?
A.Virtualize network and memory to LPARs.
B.Virtualize network and storage to LPARs.
C.Virtualize memory and processors to LPARs.
D.Virtualize storage and processors to LPARs.
Answer: B
3. Which POWER6 virtualization technology is the minimum to enable multiple shared processor pool
functionality?
A.PowerHA Standard Edition
B.PowerVM Standard Edition
C.Power6 Management Edition
D.Power6 Virtualization Edition
Answer: B
4. What is the minimum amount of memory required for a new LPAR to be built via NIM on AIX6.1?
A.128 MB
B.256 MB
C.512 MB
D.1024 MB
Answer: B
5. What is the theoretical maximum number of logical ports that a one port of a 2-port 10Gb IVE can
provide if no VIO Server is connected to the IVE?
A.2
B.4
C.8
D.16
Answer: D
6. An administrator wants to deploy a complex LPAR environment on a 595. What is the most current
tool available for documenting the proposed LPAR configuration and determining if there are adequate IO
resources?
A.LPAR Planning Tool.
B.System Planning Tool.
C.LPAR Validation Tool.
D.System Validation Tool.
Answer: B
7. Where will an administrator find documents in PDF format that include detailed architecture and
step-by-step installation instructions for Power servers?
A.AIX Fix Central
B.IBM Developer Works
C.IBM Systems Software Information Center
D.IBM Systems Hardware Information Center
Answer: D
8. Which of the following is a situation where dual (redundant) HMCs are recommended?
A.When managing more than four VIO servers.
B.When installed with Power 570 and larger hardware.
C.When hosting both Linux and AIX on the same physical hardware.
D.When unexpected outage on a single HMC would prove an untenable risk for the hosted LPARs.
Answer: D

  • 相关文章:

发表评论:

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。

日历

最近发表

Powered By Z-Blog 1.8 Arwen Build 81206

Copyright xxxx-xxxx Your WebSite. Some Rights Reserved.