Killtest题库

专业IT认证题库学习资料,助您通过IT认证考试!

« killtest题库网免费提供最新的ST0-072题库下载!最新最全的000-101题库免费下载! »

最新最全的000-100题库免费下载!(killtest题库网提供)

000-100考试题库由专业IT认证讲师及产品专家精心打造,包括了当前最新的全真试题,并且全部附有正确答案。题库的覆盖率在96%以上,通过这门考试你将获得EnterprISE TECHNICAL SUPPORT FOR Aix AND LINUX认证证书,同时这门考试也是CATE认证考试中的一门重要的科目。

在这里将000-100题库的部分题目和大家分享!

1. A customer has 2 VIO servers, supporting 4 client partitions. They want to configure Shared Ethernet Adapter Failover.

What is the minimum number of physical Ethernet adapters required for each VIO server?

A.1

B.2

C.4

D.8

ANSWER: A

2. What is the minimum requirement to update the managed system's firmware from the HMC if inventory scout is already installed?

A.A public internet connection

B.All logical partitions must be active

C.One partition must be configured with Service Authority

D.A local repository must be configured prior to the update

ANSWER: C

3. A customer wants to use Live Application Mobility which comes as part of the Workload Partition virtualization offering. Which of the following is the minimum configuration that will satisfy the customer requirement?

A.AIX 6.1 with POWER6

B.AIX 6.1 with POWER4

C.AIX 5.3 with POWER5

D.AIX 5.3 with POWER4

ANSWER: B

4. A customer wishes to use Live Partition Mobility for system maintenance. What is the minimum requirement?

A.PowerHA

B.Virtual I/O server 1.4

C.AIX Enterprise Edition

D.PowerVM Standard Edition

ANSWER: C

5. A customer is planning to use Live Partition Mobility on a new Power 570. Which of the following must be considered when pre-configuring the system in the IBM System Planning Tool (SPT)?

A.VIO-server setup is unsupported in SPT

B.Live Partition Mobility is unsupported in SPT

C.IVE setup is unsupported when using Live Partition Mobility

D.VIO-server setup is unsupported when using Live Partition Mobility

ANSWER: C

6. The Integrated Virtualization Manager is packaged with which of the following?

A.PowerVM

B.Virtual I/O Server

C.Partition Load Manager

D.Virtual Workload Manager

ANSWER: B

7. What is required to collect data for analysis by the Workload Estimator (WLE)?

A.WLE LPP

B.WLE servlet

C.bos.wle.rte fileset

D.AIX 5.3 TL3 or later

ANSWER: D

8. A customer has multiple POWER5 systems connected to one HMC at version 6. They have ordered a new POWER6 system. What is necessary in order to get the new POWER6 system managed by an HMC?

A.The old HMC can be used without change.

B.The old HMC must be upgraded to the latest level.

C.POWER6 and POWER5 must be connected to different HMCs.

D.The POWER6 system must have a separate partition on the HMC.

ANSWER: B

  考生如需下载更多完整的题库,可登录killtest题库网

 

发表评论:

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。

日历

最近发表

Powered By Z-Blog 1.8 Arwen Build 81206

Copyright xxxx-xxxx Your WebSite. Some Rights Reserved.